Shandong Chuangxin Huayi Environmental Engineering Co., Ltd
Home>Products>Underground electroplating wastewater treatment equipment
Underground electroplating wastewater treatment equipment
Underground electroplating wastewater treatment equipment
Product details

IIElectroplating wastewater treatment equipmentProduct Features

1. Buried below the surface, the surface above the equipment can be used for greening or other purposes, without the need for building houses, heating, or insulation.
2. The secondary biological contact oxidation treatment process adopts push flow biological contact oxidation, which has a better treatment effect than fully mixed or two-stage series fully mixed biological contact oxidation tanks. And it has a smaller volume than activated sludge tanks, strong adaptability to water quality, good shock load resistance, stable effluent quality, and will not cause sludge expansion. A new type of elastic three-dimensional packing material is used in the pool, with a large specific surface area and easy biofilm formation and detachment by microorganisms. Under the same organic load conditions, it has a high removal rate of organic matter and can improve the solubility of oxygen in the air in water.
3. The biochemical tank adopts the biological contact oxidation method, which has a relatively low volume load of the filling material, and the microorganisms are in their own oxidation stage, resulting in low sludge production. It only takes more than three months (90 days) to discharge the sludge (using fecal trucks to suction or dehydrate into sludge cakes for external transportation).
4. The deodorization method of this buried domestic sewage treatment equipment not only uses conventional high-altitude exhaust, but also includes soil deodorization measures.
5. The entire equipment processing system is equipped with a fully automatic electrical control system and equipment fault alarm system, which operates safely and reliably. Generally, there is no need for dedicated personnel to manage it, and only timely maintenance and upkeep of the equipment is required.
6. All pipelines of the equipment shall be made of PVC or stainless steel, and the connections between pipelines shall be bonded with PVC adhesive or welded with stainless steel. Suspended biological fillers shall be used as biological carriers, with high biomass, easy film formation, no ball formation, and no blockage.
threeInstructions for using electroplating wastewater equipment
• Capable of treating comprehensive wastewater from living systems and similar organic wastewater;
• It is made of glass fiber reinforced plastic and stainless steel, and has excellent characteristics such as corrosion resistance and aging resistance, with a service life of more than 50 years;
The complete set of equipment is simple to construct and easy to operate. All mechanical equipment is automatically controlled, and all devices can be installed on the ground;
4、 Scope of application of electroplating wastewater equipment
1. Hotels, restaurants, sanatoriums, hospitals;
2. Residential communities, villages, and towns;
3. Stations, airports, seaports, and ships;
4. Factories, mines, troops, tourist attractions, scenic spots;
5. Various industrial organic wastewater similar to domestic sewage.
5、 Installation, use, and maintenance of electroplating wastewater equipment foundation
1. Foundation: If the WSZ series equipment is placed above the floor, only a concrete floor with the same appearance as the equipment needs to be prepared as the foundation. The basic pressure must be greater than 4T/m2, and it is also required to be horizontal and flat. If the equipment is buried below the floor, the foundation elevation must be less than or equal to the equipment elevation and ensure that there is no water accumulation during rain. The foundation is generally made of plain concrete (whether reinforcement is required depends on the local geological conditions).
2. Installation: Position according to the installation diagram, and place each box in sequence. The position and direction of the boxes must not be misplaced, and the spacing between them must be accurate, and the pipes must be connected properly. Inject clean water into the equipment and check for any leaks in the pipes. If not, cover the area around the box with soil until the equipment inspection hole is reached, and level the ground. Connect the control line of the electrical control box to the water pump, and connect the electrical control box to the power supply. When wiring, pay attention to the direction of the fan and motor, which must be the same as the direction pointed by the fan.
6、 Buried electroplatingSchematic diagram of sewage treatment plant
7、 ElectroplatingMain technical parameters of sewage treatment equipment:

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!