Shenzhen Dongyang Refrigeration Equipment Co., Ltd
Home>Products>Shenzhen chiller manufacturer/Shenzhen Dongyang chiller/Electroplating chiller/Dongyang chiller TY-08W water
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    15012699306
  • Address
    Building 17, Third Industrial Zone, Longxi Community, Longgang Street, Longgang District, Shenzhen City
Contact Now
Shenzhen chiller manufacturer/Shenzhen Dongyang chiller/Electroplating chiller/Dongyang chiller TY-08W water
Brand: Toyo Name: TY-08W Water Cooled Chiller Cooling Capacity: 18750kcal/h (21.8kw) Compressor Power: 5.6kw Water Pump: 0.75kw Water Tank Volume: 0.1
Product details

Performance characteristics of Dongyang water-cooled chiller:
1. All pipeline insulation designs are designed to prevent local convection in the body's pipelines.
2. The cooling temperature range is 5 ℃ -35 ℃.
3. Independent temperature controller for antifreeze protection.
4. Stainless steel insulated water tank.
5. Control the phase sequence protection of the control circuit and control the high and low voltage switches of the refrigerant system.
6. Hydrophilic finned condenser with better heat transfer effect and faster heat dissipation.
Both the compressor and pump have overload protection.
8. Adopting a large capacity shell and tube evaporator, it has good refrigeration effect and can be applied to environments with high temperatures.
9. Refrigerant used
R22The cooling effect is good.
10. Optional
R407CEnvironmentally friendly refrigerant, closer to nature.

Parameters of water-cooled chillerTechnical Table:

model
Parameters
unit TY-03W TY-04W TY-05W TY-08W TY10W TY-12W TY-15W
power supply V 3 Φ 380V 50Hz
Refrigeration capacity Kw 9.59 12.43 15.91 24.85 31.83 38.37 50.14
Kcal/h 8250 10700 13700 21400 27500 33000 43200
Rated input power Kw 2.62 3.55 4.5 6.75 8.25 10.5 12.75
Maximum operating current A 6.7 8.4 10.5 16.5 20.4 24.6 31.8
make
cold
a pharmaceutical or other chemical preparation

type R22
filling amount Kg 1.7 2.2 2.8 4.4 5.6 6.8 8.4
control mode capillary Capillary/Thermal Expansion Valve
press
shrink
machine
type vortex Spiral/piston type
power Kw 2.25 3.0 3.75 6.0 7.5 9.0 11.25
cold
step back
water
amount of water m3/h 2.06 2.67 3.42 5.34 6.85 8.24 10.78
Inlet and outlet pipe diameter 1" 1" 1" 1.5" 1.5" 2" 2"
cold
freeze
water
amount of water m3/h 1.65 2.14 2.74 4.27 5.47 6.59 8.62
Inlet and outlet pipe diameter 1" 1" 1" 1.5" 1.5" 2" 2"
water
pump
power Kw 0.37 0.37 0.37 0.75 0.75 1.5 1.5
pressure Kpa 242 242 242 290 290 205 205
External dimensions long mm 980 980 980 1400 1400 1400 1600
wide mm 520 520 520 700 700 700 800
tall mm 960 960 960 1350 1350 1350 1500
Water tank capacity m3 0.055 0.055 0.055 0.18 0.18 0.23 0.33


model
Parameters
unit TY-20W TY-25W TY-30W TY-35W TY-40W TY-45W TY-50W
power supply V 3 Φ 380V 50Hz
Refrigeration capacity Kw 67.14 81.53 99.91 117.28 129.06 148.68 153.91
Kcal/h 57800 70100 86000 100800 112000 127800 132300
Rated input power Kw 16.5 19.76 25.34 29.4 31.77 38.6 42.5
Maximum operating current A 42.1 48.5 58.3 65.4 75.4 80.6 88.4
make
cold
a pharmaceutical or other chemical preparation
type R22
filling amount Kg 10.0 12.6 15.0 18.4 20.0 22.6 25
control mode Capillary/Thermal Expansion Valve
press
shrink
machine
type Spiral/piston type
power Kw 15.0 18.75 22.5 26.25 30.0 33.75 37.5
cold
step back
water
amount of water m3/h 14.44 17.54 21.32 25.22 27.7 31.98 33.09
Inlet and outlet pipe diameter 2" 2.5" 3" 3" 3" 3" 3"
cold
freeze
water
amount of water m3/h 11.55 14.03 17.06 20.18 22.19 25.58 26.48
Inlet and outlet pipe diameter 2" 2" 2.5" 3" 3" 3" 3"
water
pump
power Kw 1.5 2.2 2.2 3.7 3.7 4.0 4.0
pressure Kpa 220 220 250 250 250 280 280
External dimensions long mm 1600 1600 1800 1800 2200 2200 2200
wide mm 800 800 950 1950 1150 1150 1150
tall mm 1500 1500 1650 1650 1700 1700 1700
Water tank capacity m3 0.33 0.37 0.46 0.46 0.76 0.76 0.76





Note:1.High voltage pumps can be ordered according to special customer requirements;


2. The above specifications are designed for a 50Hz/380V power supply;

3. Please specify before placing an order for low-temperature or acid resistant machinery;

4. The above product standard design has a cold water inlet temperature of 12 ℃;

5. Product specifications are subject to change without prior notice

工业冷水机


Precautions for operating Dongyang chiller unit:

1. The chilled water pump cannot operate without water in the water tank;

2. Please try to avoid continuous switching when operating the switch;

When the frozen water temperature reaches the set temperature, the compressor will automatically stop running, which is a normal phenomenon;

4. The temperature switch should be avoided from being set below 5 ℃ to prevent the evaporator from freezing; (Excluding low-temperature freezers)

To ensure the cooling effect and maintain the best condition, please regularly clean the condenser, evaporator, and water filter


1. High pressure water pumps can be ordered according to special customer requirements2. The above specifications are designed for 50HZ/380V power supply


3. Please specify before placing an order for low-temperature or acid resistant machines4. The above products are designed according to standards, with a cold water inlet temperature of 12 ℃

5. Product specifications are subject to change without prior notice.


Scope of application of chiller: The product is widely used in industries such as injection molding, electroplating, electronics, chemistry, hardware, food, fish farming, dyeing, sauna and cold water bath.
Daily maintenance of chiller:
1、 Regularly check whether the voltage and current of the chiller are stable, and whether the sound of the compressor running is normal;
2、 Regularly check whether there is any leakage in the refrigerant of the chiller;
3、 Check whether the cooling water system of the chiller is normal, whether the cooling tower fan and sprinkler shaft are running well, and whether the water replenishment of the built-in water tank of the chiller is normal;
4、 When the chiller is used for up to six months, it should be cleaned once a year. The main cleaning parts include the cooling water tower, cooling (heat dissipation) water pipe system, and shell and tube condenser to ensure better cooling effect
5、 When the chiller is not in use for a long time, the circuit switches such as the water pump, compressor, and main power supply of the cooling (heat dissipation) water tower should be turned off in a timely manner.
Honor and Qualification:
Top 10 Chiller Industry in Shenzhen
Shenzhen Gold Medal Manufacturer
Longgang Excellent Enterprise
China's Top 500 Refrigeration Companies
Dongguan Customer Satisfaction Enterprise
Exemplary organization of Dongguan Implementing Customer Satisfaction Project
Our services:
Free delivery: Our company has dedicated drivers to deliver to your doorstep
Free installation: Our company strictly follows the relevant national construction and acceptance standards for engineering installation. After the completion of the project, the system will be debugged. If all performance indicators are qualified, both parties will sign and accept it, and the delivery party will use it.
Free design: Design according to customer needs.
Maintenance and upkeep: After the free maintenance period expires, our company offers lifetime discounted services and only charges maintenance fees.

Timely delivery: Confirm customer orders and ship them as soon as possible. It takes only one day to arrive in the Pearl River Delta region. 3-5 days in remote areas

Our services

1Product packaging

The company is a professional manufacturer of chillers/ice water machines/freezers, screw feeders, and crushers/Manufacturers of injection molding machine auxiliary equipment such as crushers, color mixers, and mixers. The machines are packaged in films and cardboard boxes from the factory to prevent water ingress or friction. At the same time, wooden boxes are packaged according to customer requirements to prevent damage to the goods during transit.

2Product transportation

The company is a member customer of Deppon, Simbond and other large logistics enterprises, and can enjoy the advantage of priority delivery. At the same time, it can arrive in Guangdong Province and surrounding cities of the the Pearl River Delta within 1-2 days, and in remote cities within 3-5 days. At the same time, it can arrange door-to-door delivery or door-to-door picking and other services; At the same time, small corresponding accessories are delivered to surrounding cities in about one day through cooperation with large express delivery companies such as Shunfeng, Shentong, and Suer. Other remote cities can quickly reach the customer's company according to the express delivery situation (except for special natural disasters such as earthquakes, flash floods, mudslides, etc.).

3Product after-sales service

On site commissioning of large equipment: Our company conducts commissioning and installation of newly purchased large units for customers. Customers should notify our service department in writing 3 days before commissioning, so that our company can arrange commissioning personnel to arrive at the site for commissioning within the time required by the customer; The machine comes with a 12-month free warranty and provides free technical support.

Lifetime maintenance service: During the warranty period, if the machine encounters any abnormal situations, our company will provide free inspection and maintenance, but does not include human damage caused by the user. After the warranty period, we will continue to track and implement lifelong maintenance service. If replacement parts are needed, only the cost of the parts will be charged.

Timely, thoughtful, and comprehensive service: In order to relieve users' worries, our company has equipped a strong after-sales service team with multiple specialized after-sales service personnel in various regions across the country. Our company has sufficient reserves of various spare parts, and we promise to ensure that maintenance personnel will send professional maintenance personnel to the site as soon as possible to solve the problem after receiving the customer's request for maintenance service call and confirmation.







Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!