Jiangsu Tianhe Water Equipment Co., Ltd
Home>Products>SG type steel wire rope traction grid cleaning machine
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
  • Address
    Xinhe Industrial Park, Jiangdu District, Yangzhou City, Jiangsu Province
Contact Now
SG type steel wire rope traction grid cleaning machine
SG type steel wire rope traction grid cleaning machine
Product details

SG type steel wire rope traction grid cleaning machine

purpose
Suitable for deep channels with large grid gaps (usually 20-100mm) and channel widths not exceeding 4m For channels wider than 4m, mobile grids or mobile grab buckets can be used The adaptable medium is sewage containing sediment.

View PDF

characteristic
1. Wide applicability, with a width of up to 4m and a maximum depth of up to 30mm
2. Large amount of slag removal (up to 300kg/Z or more) Even mud and sand can be salvaged The slag unloading efficiency is high and the effect is good.
3. There are few vulnerable parts and no moving parts underwater Easy maintenance and repair; Equipped with over torque protection, it operates safely and reliably.
4. The operation control of the grille runs at set time intervals (at least one working cycle per day) It can also be automatically controlled based on the water level difference before and after the grid.

Note: The effective rate of the water surface corresponds to 70% -85% of the grid gap,
2. When the attenuation power corresponds to a well depth of 10m and exceeds 10m The power needs to be increased.
3. The installation angle a is generally 75 or 90 degrees

Ordering Instructions
1. Indicate the equipment model, well width, well depth, grid height and gap, installation angle and other parameters If the water depth in front of the fence is not specified, the height of the fence bar will be ordered at 2 meters.
2. Supporting equipment such as electric control boxes, level gauges, screw presses, shaftless screw conveyors, and slag trucks should be separately ordered, and it should be indicated whether they are controlled by liquid level difference or time, or both simultaneously.
3. The equipment material and anti-corrosion requirements are not specified, indicating that the order is based on ordinary anti-corrosion carbon steel.
4. Installation angle of the equipment Usually 750 or 900, special orders for other angles.
5. There are two ways to fix the rack and side walls: expansion bolts and embedded steel plates (when B ≥ 1.5m, embedded steel plates are required for fixing). If embedded steel plates are used for fixing The elevation and size of the embedded steel plate should be provided Tianhe Water Company can provide detailed pre embedded part drawings.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!