Installation requirements for industrial steam generators:
Product details

工业型蒸汽发生器

Installation of industrial steam generatorrequirement:

1. This equipment should be installed as close as possible to the steam equipment, and the length of the inlet and outlet pipes should be as short as possible to reduce unnecessary bends. The pipes should not be installed repeatedly up and down to reduce resistance and water accumulation, but necessary maintenance space should be ensured.

2. The exterior of the pipeline must be insulated with heat-resistant glass fiber insulation pipes to reduce heat loss and prevent accidental burns to workers.

3. After the pipeline installation is completed, a hydrostatic test should be conducted to ensure that there is no leakage at the connection.

4. Valves should be installed at all points of the pipeline connected to the host for easy maintenance and upkeep in the future.

Attention:Industrial steam generatorDistilled water or softened water should be used, and the drain valve should be opened at the end of each day to remove scale. At the same time, the pressure inside the industrial steam generator should be released to zero, and then the evaporator should be filled with softened water to ensure that oxygen corrosion does not occur in the evaporator.