1. Purpose, Function, and Scope of Application:
1Purpose:
GLW2-TQ201RType electric energy collection terminalcorrectGPRSThe components of the remote centralized meter reading system can complete real-time data collection up to32The energy information of a multi rate electricity meter is stored and transmitted internallyGPRSSend data to the backend server,Thus completing the data transfer to the next level.Realize modern urban residential electricity management.
2Main functions and features
·ByGPRSTransmission and parameter setting.
·Single-phase AC power supply,Normal operation due to phase deficiency.
·It has a programming lock function to prevent illegal modification of system parameters.
·IAPSystem upgrade function, enabling remote system upgrade.
·Comes with a built-in system clock and non volatilityEEPROMData storage.
·Stable performance and low power consumption.
·Adopting alloy material shell, with superior anti-interference performance.
·Equipped with low voltage detection and watchdog circuit.
3Scope of application
This collection terminal is suitable for extreme environmental temperatures of-30℃~+75℃,Relative humidity not exceeding85%The region.
This product's various technologies comply with national standardsDL/T698-1999.
2. Specifications and Main Parameters:
·Specification: Can collect and transmit data32Only the electricity consumption data of the energy meter.
·General working voltageAC 220V, frequency50HzSingle phase system.
·Working voltage:AC 175~265VWorking frequency:50Hz±5%
·Power consumption: ≤3W/5VA/Household (communication status)
≤0.3W/0.5VA/Household (non communication status)
·Environmental conditions: Operating temperature:-30℃~+75℃
Relative humidity: ≤85%
·Power outage data storage validity period:20year
·485bus communication
III. Main Structure:
DCGLW2-TQ201RType electric energy collection terminalAdopting a metal shell, it has good anti-interference performance and control circuit,485Bus. The collection terminal is equipped with measures to prevent unauthorized personnel from operating, and the cover is fixed with screws and can be sealed with lead.
4. Working principle:
Collecting terminalsRS485Interface and single-phase energy meterRS485Interface connection, the collection terminal will collect the electricity consumption data of the energy meter throughGPRSUpload to the backend server. When installing or replacing the collection terminal and energy meter, the computer's setting software must be used to set the initial parameters of the collection terminal, including the collection terminal number, the circuit number of the connected energy meter, the meter number, the meter constant, and the meter base number,MCUWrite toEEPROMIn the middle.