1、 Overview
DTSYF6607 Three phase Electronic Prepaid Multi rate Energy Meter(hereinafter referred to as“instrument”)It is designed and manufactured based on the actual electricity consumption of residents. It has high accuracy and reliability.
This instrument adopts advanced energy metering dedicated chips, designed in combination with mature multi rate and prepaid technologies, and is applied16Digital Sampling Processing Technology andSMTHigh tech products manufactured by craftsmanship. The key components are selected from internationally renowned long-life devices, which improves the reliability and service life of the product. The data display adopts a large screen LCD, which is convenient for meter reading.
This instrument can realize functions such as time-sharing metering prepayment, setting daily meter reading, handheld computer programming, and meter reading; Can be set2A time zone,3Fee rate,12Daily time period; And it has infrared and485Communication function, capable of remote meter reading, communication protocol can supportDL/T 645-2007The Communication Protocol for Multi functional Energy Meters provides essential conditions for the automation management of electricity consumption.
Its performance indicators meet the requirementsGB/T17215-20021《2Level andThe technical requirements for electronic active energy meters in the "Static AC Active Energy Meter" comply withGB/T15284-2002The "Special Requirements for Multi Rate Energy Meters" specifies the technical requirements for multi rate energy meters and complies with themGB/T18460-2001《IC
Technical requirements for card prepaid electricity sales system.
2、 Main functions
Prepaid multi rate energy meters have the following basic functions:43.1 Time division active and reverse energy measurement, reactive energy measurement, can be divided into12Rate of fees8A time period
A time zone.
3.3 Infrared communication, programming settings, and meter reading can be performed through a handheld computer.323.4 It is possible to implement parameter rotation, and the parameters displayed on the rotation should not exceed
The items and time intervals can be pre-set, and the order of parameter rotation can also be set arbitrarily.
3.5 Equipped with optocoupler isolation active passive pulse output interface, with the same pulse constant as the meter constant.123.6 RecordsTotal active power and hourly power of months,485And it can be achieved through infrared or
Meter reading method.
3.7 It has programming prohibition function and data reset function.
3.8 Support for reduced meter reading according to departmental regulations.3.9 Having the ability to purchase electricity before using it,
And automatically freeze the monthly electricity consumption rates on the designated meter reading day.3.10 Can be usedIC
Set parameters and meter reading for the card.3.11 adopts a one table one card method,IC
Multiple verification and encryption of data in the card, secure and reliable.
3.12 Each time electricity is purchased, data is transmitted bidirectionally through the power card.
3.13 Can set non working hours and emergency credit limits.3.14 Within the rated current range, the maximum operating power can be limited(Restricted by the power supply department)
.
3.15 has an external alarm output interface.
3.16 has built-in sound and light alarm, trip and power-off functions
a. When overloaded, it is possible to control the output of alarm and trip signals by selecting whether to allow alarm tripping.
b. When the remaining power is less than or equal to the alarm set value, the alarm and trip signals can be controlled by selecting whether the meter is allowed to output alarm and trip signals.
c. When the remaining power is zero, the meter outputs a trip signal.
3、 Working principleWhen the electric energy meter is working, the voltage and current are sampled separately by the sampling circuit, and then multiplied by the dedicated integrated circuit for electric energy processing before being sent toCPUProcess it, and finally,CPU
Send the processed data to output devices such as the display and communication sections as needed.Managed by a computer information system, throughICCard reader/writer, capable of writing a certain amount of power and monitoring requirementsICThe microprocessor system in the card input table, throughCPU
After calculation, provide display, alarm, and cut-off status signals.
4、 Technical indicators1.0 4.1 Accuracy Level Merit2.0 Reactive power
level4.2 Reference voltage
220/380V4.3 Rated current3X 1.5(6)A、2.5(10)、5(20)A、10(40)A、15(60)A、
20(80)A4.4 Rated frequency
50Hz14.5 Starting currentLevel: ≤ 20.004InLevel: ≤
0.005In
4.6 Stealth with anti creep logic design
4.9 Electrical Parameters |
Operating Voltage0.9Un~ |
1.1Un |
Extreme working voltage0.75Un~ |
1.15Un |
Voltage line power consumption≤2Wand |
5VA |
Power consumption of current circuit< |
1VA |
Data backup battery voltage3.0V |
DC
4.10 Rate Working ParametersClock accuracy(Daily error |
)≤0.5S (23℃ |
) |
Battery capacity≥ |
1000mAh |
Data retention time after power outage10≥year(Use new batteries |
)
4.11 Climate conditions |
-20Normal operating temperature℃+50~ |
℃ |
-30working temperature limit℃+60~ |
℃ |
-40Storage and transportation temperature℃+70~ |
℃ |
Storage and working humidity≤ |
85%
4.12 Technical Parameters |
4 |
Number of rates |
12 |
Number of time periods |
2 |
Number of time zones |
0Measurement range~ |
999999.99 kWh |
displayLCD (Liquid Crystal Display)(LCD |
) |
Baud rateRS485:1200bps~9600 bpsInfrared port |
: 1200bps |
Communication Protocol《DL/T645-2007 |
Communication Protocol for Multi functional Energy Meter
7、 Programming instructionsseven point zero oneProgramming allows. Open the programming switch button of the electric energy meter by the authorized person(pass throughICCard transmission signal completed),
LCDThe programming symbol on the display screen indicates that the energy meter is in programming mode. At this time, the handheld computer can communicate with the energy meter to complete the programming settings.seven point zero two
Data reset. If the energy meter is in the zeroing allowed state, use the zeroing card to reset all internal electricity data and historical record data of the meter. After resetting, the electricity meter displays:E=00.seven point zero threeProgramming is prohibited. After programming the energy meter(pass throughICCard transmission signal completed
)10Press the programming switch button once,
LCDThe programming symbol on the display screen disappears, and the energy meter is in a programming disabled state. The internal parameters of the energy meter can only be read out and cannot be modified. Only electricity meters within the specified error range can be calibrated.Note: In order to prevent the programming switch from being forgotten to turn off after being turned on and operated by unauthorized personnel, special settings are made in the table
The programming time is allowed in minutes, and when the time exceeds, the meter will automatically disable programming.4seven point zero four
Meter number and factory number: the identification number for communication between the handheld computer and the energy meter. When reading or setting up meters, it is necessary to input the meter number or factory number of the energy meter in order for the handheld computer to communicate with the energy meter normally. The meter number can also be assigned to the user's account through the purchase of a power card. Can be viewed through the reading button3“3.1B”
The content of the item indicates the table number of the table. The factory number is assigned when the electricity meter leaves the factory and printed on the meter nameplate.seven point zero fiveRotation time: The display time of each data item during rotation, with the default rotation time beingIn seconds.seven point zero six28Wheel display content encoding: The encoding of the wheel display content that users can set according to their needs, please refer to the appendix for details0.28seven point zero seven24Automatic meter reading date and time: programmable meter reading date and time. As per the script“3.1A”When the item (automatic meter reading date) is entered, it will be coded as
28 00
The electricity meter will be used on a monthly basis040503 daily041003Automatically save the current data to last month's records. Users can set their content as needed. (Date greater than)
Time setting01, then automatically switch to0201 0003)04seven point zero eight
Primary and secondary time periods: Two time periods can be set, namely two sets of rates, such as daylight saving time.24seven point zero nine
Starting and ending dates of sub time periods: such as setting a start date
Stop date.seven point one zero
Time period and rate number: The peak rate number is
The peak rate number is
The flat rate number is
The grain rate number is
.
seven point one one
Public holidays: can be set oncePublic holidays.seven point one twoWeekends: You can specify the middle of each week as a weekend.seven point one threeNon business hours: You can set daily non business hours. For example:18:00-08:30.seven point one fourEmergency credit limit: It can be set to allow users to have emergency credit limits during public holidays, weekends, and non business hours.The above management parameters can be transmitted from the management system to the user's electricity meter through preset cards and purchase cards.
seven point one five1Date: should be the current accurate date.seven point one sixTime: should be the current accurate time.The date and time should be regularly checked on-site.8、 Installation and wiringeight point oneThe instrument is inspected and sealed with lead before leaving the factory. Before installation and use,Check if the lead seal is intact
,Once the lead seal is intact, it can be installed and used,For instruments without lead seals or with a long storage period,
Relevant departments should be requested to conduct a re inspection
,
Qualified for installation and use.eight point twoThe instrument should be installed in a ventilated and dry indoor area, fixed with three screws according to the diagram
Installation dimensions shown5(150
×0231)40Drill holes on the bottom plate first,The base should be fixed on a sturdy, fire-resistant, and non vibrating object to ensure safe and reliable installation and use. It should be installed in areas with dirt or potential damage to the instrument
,
Instrument application protection cabinet protection.
eight point three
3.3The instrument should be wired correctly according to the wiring diagram. It is recommended to use copper wire or copper joint for the incoming wire of the terminal box
,
The screws inside the terminal box should be tightened2,08Avoid burning caused by poor contact or overheating due to thin leads.008.4 The instrument will enter normal operation after being powered on with the correct wiring as described above.119、 Transportation and storage30The product should not be subjected to severe impact during transportation and unpacking, and according to
GB/T5464-19953The General Technical Conditions for Instrument Packaging stipulate transportation and storage.11Inventory and storage should be stored on racks in their original packaging conditions, and the stacking height should not exceed30Layer.18The storage location should be clean, and the ambient temperature should be30~
℃, relative humidity not exceeding485%18And there are no harmful substances in the air that can cause corrosion.3010、 Guarantee period23From the date of sale, if the electric energy meter is found to not meet the requirements specified in the technical specifications, provided that the user complies with the instructions and the manufacturer's lead seal is still intact, the company will provide a one-year return, three-year replacement, and five-year repair guarantee.00Appendix
Main time period and rate setting51. Set corresponding electricity prices for peak, off peak, off peak, and off peak rates according to the prescribed electricity pricing policy.23auxiliary word for ordinal numbers00Time period:07:00arrive
:5formant
auxiliary word for ordinal numbers
3.7Time period:
:
arrive
:8119Flat section4auxiliary word for ordinal numbers
Time period::arrive:
formantauxiliary word for ordinal numbersTime period::
arrive:Valley sectionThe minimum interval between time periods isMinutes, the time period can cross zero.Unable to provide emergency credit, therefore the daily time slot number does not work.
Setting of sub time periodsDivide the internal rates of the meter into two sets, one as the main rate (operating rate) and the other as the secondary rate (standby rate). The primary and secondary rates can be switched between each other (following the setting command). If the superior notifies that the rates and time periods need to be adjusted, the staff can set them several days in advance and ensure that all the meters set are converted on the same day and at the same time. This not only provides sufficient working time (lead time), but also ensures that policies are implemented at the same time (reducing the difficulty of electricity calculation software)
A、 The sub time period setting is similar to the main time period setting, please refer to the main time period section.B、 Time period start and end date setting: identification code()Set score
Scenario:i. As from
04.10.011Starting from [date], execute the sub period:8119=000000 0410012ii.Execute from the current date until
04.10.012Day end:
8119=041001 000000
iii.3follow004.06.01
From day to day2 04.10.01
Date execution:
8119=041001 040601iv.Stop sub period:8119=000000000000The start and end dates of the sub period are set in811F
The load control package is transmitted to the user's electricity meter together.
4、 Accident handling:(
)When there is an unexpected malfunction or damage caused by human operation (the meter cannot operate) in the already opened meter, open the meter and save the data stored in the already opened meter
EPROMIf the display panel is unplugged and replaced with a new meter, the new meter can replace the original one and all data and fault tables are the same. (The nameplate of the electric meter also needs to be replaced with a new one)8100(8101)When the allowed load and remaining power exceed the pre-set values, and the available power of the meter is zero, the meter will output an alarm or trip signal.8102Attention: When both alarm and trip are selected, trip takes priority over alarm.8103(8104)When the remaining electricity on the meter is8105If the external power supply circuit cannot be disconnected due to emergency credit or other reasons, the electricity meter will start calculating the overdrawn power and automatically deduct the overdrawn power when the next power card is inserted.8106appendix8107User Attention Notice81081. One table, one card:8109The user holds
IC
Cards cannot be exchanged. If lost, please go to the power supply department(Electricity sales office)Purchase an additional one.302. Preparation for purchasing electricity:3Before purchasing electricity, users mustICInsert the card into the electricity meter once to facilitate sending the data in the meter back to the computer database.3. When purchasing electricity, please declare the amount of electricity to be purchased and the alarm reminder amount.4. Electricity card usage: Insert the purchase card into the electricity meter. If it is a valid purchase card, the electricity meter will automatically read the data into the meter,
LCDThe display screen sequentially shows:Total purchased electricityRemaining battery capacityOverdraft electricityPurchase electricityMeter frequency
Alarm battery levelAccumulation limitCredit limitLimiting powerPurchase information such as purchase date. Please store the unplugged card properly.25. Operation display: During the operation of the electricity meter, it alternately displays the total average electricity, peak and valley electricity, remaining electricity, and operation period in the meter.6. Overcapacity alarm: During the operation of the electricity meter, if“call the police”LED1If the indicator light flashes rapidly, it warns the user that the battery has exceeded its capacity. If the meter is set to the over capacity power-off limit mode, then the over capacity electricity will be usedIn seconds, the brake will be pulledMinutes and countdown display(180second2)
Time to restore power supply; The user's card insertion response can immediately restore power supply.107. Accumulation limit: If purchased electricity+remaining electricity>Accumulation limit (e.g: 9999kWh)If the purchased electricity is not read in, the display will show“8106 NNNNNN”Reminder: The battery level in the card is still valid.
8. Warning reminder: When the remaining battery level in the meter is less than“Alarm power level”ofWhen doubled,“call the police”LED
The indicator light will flash at intervals ofDisplay a reminder to the user to purchase electricity in seconds. If the user responds by inserting the card,“Alarm indicator light”
The flicker interval has changed to0Seconds can avoid power outage warnings.9. Power outage warning: If the user does not respond by inserting the card during the warning reminder, the remaining battery level will be the alarm battery level agreed upon by the user (or the current purchased battery level)%When the electricity meter is turned off, a warning will be issued for power outageICPlug in the meter once to restore power supply. If this table cannot be found after pulling the switch
IC