be applied to:
Atmospheric sounding
Meteorological system
Research System
Instrument calibration
environmental monitoring
Climate Research
Haze monitoring
Major events
Atmospheric multi-element sounding
Aerosol sounding
Ozone sounding
High degree of integration, complete range of detection types,
Wide detection range,
Suitable for airships and balloons for sounding, masts, towers, etc.
Software chart display:
Security investigation case:
Attachment:
Preparation checklist for ozone sounding instrument testing in advance
Prepare 3-7 days in advance:
1Preparation of standard solution:
Time:
Location:
participant:
2Fill in the following factory calibration setting list:
Ozone sounding instrument serial number:
Factory time:
Pressure of the air pump:
Voltage of the air pump:
Current of the air pump:
Airflow rate:
3Connect the probeTeflonThe intake pipe and air pump are connected to the cathode tube and the air outlet of the air pump; Connect the sounding instrument motor and ozone generator testing unit. Let the air pump and dry sensorHI O3Below, proceed30minAdaptation period.
HI O3perform10minAfterwards, record:
|
test value |
critical value |
PumpCurrent |
Pump current |
mA< |
90mAPump |
voltage |
Air pump pressure |
V12-13V4Allow the air pump and sensor to operate
NO O3 10minThen, turn off the ozone motor.
5Inject standard solution into the sensor:Cathode:3cm3; Anode:
1.5cm3;6Connect the ozone radiosonde and turn on the ozone motor. perform
10min NO O3 .Record the current value:μ0.2A(≈μ
A).7performLO O3Observe that there will be a positive current value appearing in the micro ammeter, approximately4-5μAThen close it0.
U VLamp, the current slowly drops back to8Allow the air pump and sensor to operate
NO O3 10minThen turn off the motor of the ozone radiosonde.9use
1k
Short circuit the cable, causing a short circuit between the two cables of the sensor.
Place the ozone radiosonde in a dark and clean environment with an ambient temperature of 10-25 ℃.
Preparation for Ozone Sounder Testing1、 Preparation of anode cathode standard solution:
1Materials required for equipping standard solution:2 Potassium iodide:
KI;Potassium bromide:
KBr;2Sodium dihydrogen phosphate monohydrate:4NaH2PO.H
O;2Sodium dihydrogen phosphate dodecahydrate:4Na2HPO.12H
O
2 ;2 double distilled water or triple distilled water;
2 1000mlOne or more flasks;
2 200mlOne or more flasks;
2 1000mlOne colored glass bottle;
2 250mlOne colored glass bottle;
3.5mlOne syringe;
2Cathode and anode standard solution configuration:
a)Cathode standard solution2 Distilled water:
2 500ml;KI:
2 1000g;KBr:
2 2500g2;4NaH2PO.HO:1.25 g2perhaps4NaHPO.2H2O:
2 1.41 g2;4Na2HPO.12HO:5.00 g2perhaps4Na2HPO.7HO:
3.73 g;Shake the above water and chemicals vigorously, then add distilled water until
1000mlForm a cathode standard solution.
b)Anode standard solution2 in50mlPour the pre configured cathode standard solution into the plastic bottle
25ml;Place it in the above standard solution in two directions
90g KI
Crystal;
Quickly shake well and dissolve the crystals. When some crystals still cannot be dissolved, it indicates that the solution is saturated;
2. Form anode standard solution;
2、 Ozone generation preparation
We need one ozone generator, as shown in the following figure:
3、 Preparation for measuring ozone airflow rateThe following devices need to be installed in the chemical laboratory, which are not available in general areas.(e)1Soap1SolutionprepareKey detergent andAdd glycerol spoon to1L
In distilled water, it forms
Soap Solution
2 .
2 4、 Preparation for Ozone Zero Calibration