Hebei Sanyang Shengye Fiberglass Group Co., Ltd
Home>Products>YJGY Zirconium Industry Exhaust Gas Treatment Equipment Manufacturer
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    18831897799
  • Address
    No. 189 Fuqiang North Road, Zaoqiang County
Contact Now
YJGY Zirconium Industry Exhaust Gas Treatment Equipment Manufacturer
YJGY Zirconium Industry Exhaust Gas Treatment Equipment Manufacturer Overview is a combination exhaust gas treatment device designed and developed spe
Product details

The product is a customized product, and the above quotation is a deposit

overview

It is a combined exhaust gas treatment device designed and developed specifically for the characteristics of the waste gas generated by the zirconium industry. It has been widely used in this industry and has been recognized and praised by users.

technological process

exhaust gas- Steam water separator - centrifugal fan - packless spray purification tower - standard gas emission

principle

The exhaust gas first enters the steam water separator, which is designed to contain water vaporUnder the action of centrifugal force, HCL gas makes the liquid flow into the drainage outlet of the equipment, and the gas passes through the combined demisting device and enters the packless spray purification tower. The gas enters the tower from the air inlet below the tower body. Under the power of the fan, it quickly fills the air inlet section space, and then rises evenly. Under the action of the circulating pump, the alkali liquor is evenly distributed to each liquid distribution pipe, and fills the entire tower space in the form of fog. It is fully saturated with the rising gas, and quickly and thoroughly carries out the chemical reaction, so that the standard gas after the intermediate treatment is discharged into the atmosphere.

Structure and Characteristics

It is a combined treatment equipment, consisting of steam water separator, centrifugal fan, packless spray purification tower and accessories.

1. The overall forming strength is high by using fiberglass winding, and the cylinder body has no flange connection bolts; The sprinkler pipe is made of PVC or PP material, and the nozzle is made of PP material.

2. Adding a truncated cone shaped liquid distributor inside the tower avoids the phenomenon of "dry cone" (i.e. empty center of the tower) and enables more complete absorption.

3. A backwash automatic sewage filtration device has been installed at the tower and pump suction port to ensure timely discharge of system pollutants without blocking pipelines and nozzles.

Contact: Manager Yao mobile phone:18831897799

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!