Product Introduction:one-step method(Seamless)PE elbow
1one-step methodPE elbowFunction:Change the direction of the pipeline
IIone-step methodPE elbowSpecifications and types:
1Φ159mm-1380mmVarious caliber specifications;
2There are four conventional angles: 45 °, 60 °, 90 °, and 180 °.
IIIone-step methodPE elbowThe physical properties of
1. Because it isWhole material extraction, no welds, no jointsThereforeReliable connection、High strength,Has strong shear force、Stress resistance,Crack resistanceandExcellent creep performance, no need to worry about cracking; possessingGood waterproof performance and corrosion resistance, can be directly buried underground or in water.
2. Seamless PE elbow pipe wallUniform thickness, good insulation performance,Connected to the overall pipelineSimple and fast, requiring minimal labor and materials, can quickly meet the needs of engineering projects,Greatly reduce the comprehensive cost expenditure of enterprises.
3Can be in-Safe use within 60-40 degrees Celsius, less likely to cause pipe breakage in winter, and construction is not affected.
4Good toughness and flexibility, strong adaptability to uneven and misaligned foundations, and able to resist harsh environments such as earthquakes and typhoons; Has good weather resistance (including UV resistance) and long-term thermal stability.
5Outstanding resistance to environmental stress cracking performance,Good wear resistance, aging resistance, and chemical corrosion resistance,Abrasion resistance,Can be used under ideal conditions50 years.
6、Smooth inner wall, high flow capacity, and flow velocity can reach20m/s, Save operating costs.
7Fully suitable for traditional excavation construction methods and new non excavation technologies such as pipe jacking, directional drilling, lining, cracking, and sinking underwater;Can be usedheatShrink tape or electric heatingmeltbeltconnect,Convenient and reliable, easy to construct and maintain.
8 PEThe raw materials only contain two elements, carbon and hydrogen, which are harmless to the environment and environmentally friendly,Suitable for transporting natural gas and liquefied petroleum gas、gasHeating and water supply usage.
4one-step methodPE elbowThe costadvantage
Whether it is pipeline construction for oil and gas transportation, pipeline engineering for heating and water supply, or pipeline construction for sewage and drainage, that is to say, in the construction of underground pipe galleries, when pipelines need to turnWe cannot do without bends.During the entire pipeline construction,Although the demand for PE elbows is not high, they are very important, played byThe role of carrying forward the past and opening up the futureAccording to traditional production methods, pipes of the same caliber need to be cut into sections at certain angles,rightAfter that, it needs to be welded together in sections to form a complete bend, and even a few people working together may not be able to make many in a day.Therefore,Making elbowsalreadyIt is an itemneedSpending a lot of manpower, material resources, and financial resourcesworkIt wastes pipes again, andIf the worker's welding technique is not strong enough or if they are slightly careless during welding,The tensile strength and fracture strength of the elbow are bothcangive a big discountSuch connections are often prone to leakage and corrosion.The result is that enterprises not only have high construction costs, but also affect project quality and increase subsequent maintenance costs.
5one-step methodPE elbowThe application
Widely used in insulation and cooling pipeline engineering for centralized heating, cooling, oil and gas transportation, warm rooms, cold storage, coal mines, petroleum, chemical and other industries.
VIquality assurance
Huashida's seamlessPE elbowObtained national recognitionGB/T19001-2016/ISO9001:2015 Quality Management SystemauthenticationcertificateandISO14001:2015 Environmental Management Systemauthentication,From raw materials to finished products,Every step is strictly inspected,correctTrustworthy quality products, for customersThe pipeline engineeringEscort and protect.
7global supplier
Huashida has started accepting orders from customers and welcomes new and old customers to place orders or come to inspect and negotiate cooperation. Huashida Production Base Address: Jinsheng 2nd Road, Chengyang District, Qingdao City, Shandong ProvinceNo. 69; website: https://www.qdhsd.com/ Contact phone number:.