English

Yangzhou Panfeng Electric Co., Ltd
Home>Products>Calibration device for on load tap changer tester
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13365133870
  • Address
    Liubao Town Industrial Park, Baoying County, Yangzhou City, Jiangsu Province
Contact Now
Calibration device for on load tap changer tester
The calibration device of the on load tap changer tester can automatically determine the tap position and store the corresponding transformer ratio va
Product details

Calibration device for on load tap changer testerMain technical indicators

1. Three independent test power supplies, with a large output power supply of 1A;
2. Set the sampling rate of the instrument to 10~20KHZ;
Single waveform large storage time of 6.4 seconds.
4. Transition resistance measurement range: Y/△ type transformer ≤ 40 Ω, Y type transformer ≤ 20 Ω.
5. Measurement accuracy: △ ≤ 10%
Measurement synchronicity error: 0.2ms.
7. Display: 240 × 128T, T6963 controller;
⒏ Printer: MP-40-8 panel type front paper exchange printer;
9. Processing section:
80C320 high-speed 8-bit microprocessor. Program memory 32K;
Maintain 512K bytes of data storage during power failure;
High speed A/D converter with a high sampling rate of up to 400KHZ;
Power supply 220V ± 10%, power ≤ 200W.
Size: 410mm × 320mm.
Weight ≤ 7kg
Random attachments: 4 test wires, 4 crocodile test pliers

Calibration device for on load tap changer testeradvantage:

1. Test the YO Y △ transformer and display the resistance value directly without conversion;
2. Humanized data analysis can automatically identify faults in the middle of the waveform and mark them;
3. The waveform display automatically adjusts the resistance and time amplitude based on the sampled data;
4. △ - type transformers can display three-phase synchronicity;
5. It can be tested with or without windings;
6. Four terminal wiring method, providing high-precision resistance measurement without the need for wire compensation;
7. Continuous testing can be conducted during testing to save time on transformer power outages;
8. The instrument is controlled by a small computer, equipped with an 800 × 480 color LCD touch screen and a high-speed printer;
9. The instrument can automatically save 100 sets of data internally.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!