VIP member
Product details
>Product specifications
Inner diameter mm
|
DN15
|
DN20
|
DN25
|
DN32
|
DN40
|
DN50
|
DN65
|
DN80
|
DN100
|
DN125
|
DN150
|
DN200
|
DN250
|
DN300
|
Outer diameter mm
|
Æ20
|
Æ25
|
Æ32
|
Æ40
|
Æ50
|
Æ63
|
Æ75
|
Æ90
|
Æ110
|
Æ140
|
Æ160
|
Æ225
|
Æ280
|
Æ315
|
English system
|
1/2
|
3/4
|
1
|
11/4
|
11/2
|
2
|
21/2
|
3
|
4
|
5
|
6
|
8
|
10
|
12
|
>Installation method of pipes and fittings
1. Cutting of pipes: According to the usage requirements, measure the length and use cutting tools such as steel saws, manual cutting saws, and small circular slicing to cut the required pipes. After cutting, the two ends should be kept vertical and flat, and the burrs should be removed with a file and chamfered, but not too large.
2. Bonding of pipes and fittings: Before bonding the pipes and fittings, a trial assembly is carried out to determine the installation position and make marks. The mating points of the pipes and fittings are lightly wiped with sandpaper or gauze, and then wiped with cotton yarn dipped in acetone. After the acetone evaporates, a layer of adhesive is evenly applied with a brush on the bonding surface of the pipes and fittings, without omission. Flatten and insert, then rotate to the desired combination angle for installation. Use a wooden mallet to strike and fully insert the pipe into the socket. After about 2-3 minutes, it can be fixed on its own. At this time, it is important to avoid forcibly opening or turning the direction, otherwise it may cause leakage. After assembly, promptly wipe off any excess adhesive that overflows from the bonding area to keep the pipeline clean.
3. Connection of the expansion pipe: First, clean the inner wall of the expansion pipe and the outer wall of the straight pipe insertion part. Rotate the rubber ring into the groove at the expansion end (with the sloping end facing outward), and then connect the rubber ring. Apply lubricant to the insertion part of the straight pipe. Align the straight pipe insertion end with the flared end and insert it. According to the construction site, a wire winding machine or a pry mixer can be used to insert the straight pipe into the marked position and measure the length of the expansion part, and mark it on the inserted straight pipe (the length should be shorter than the expansion length).
>Other product information
·quality, ABS and PVC-U products are required to have smooth inner and outer walls, no fibers, and allow for slight wrinkles and extremely fine impurities to be dispersed.
·packageValves and fittings are packaged in cardboard boxes according to the same specifications; The pipes are packed in plastic woven bags of the same specification, and the weight of each bundle generally does not exceed 50 kilograms.
·storageDo not throw or collide the product to avoid scratches and damage, and do not expose it to rain or sunlight.
·transportDo not throw or collide to avoid scratches or damage, and do not expose to rain or sunlight.
·service:
1. The colors of ABS and PVC-U pipeline system materials are available in milk yellow and dark gray, which can be selected by users. If users require other colors, they can customize according to their requirements.
2. ABS and PVC-U pipeline systems can be supplied according to user needs. If users require other products not specified in this manual, they can customize them according to their requirements.
3. The company has a professional installation team that provides on-site installation services for users or sends technical personnel to guide installation on site, and supplies matching adhesives.
4. After the sale of our company's products, we offer a three guarantee policy within one year and provide shipping services for customers. Users can contact us by phone or letter to place orders, or come directly for negotiations. Welcome to choose our products and we hope that users can promptly report their usage and provide valuable feedback for improvement.
5. This information is for reference only and may be modified without prior notice.
Online inquiry