【 Beyond 】 Filling Production Line - Easy Can Filling Production Line
1. Model: According to the order 2. Production capacity: 8000 bottles/hour 3. Certification: CE SGS 4. Warranty period: 1 year 5. Overseas service pro
Product details
Two in one machine for filling and sealing cans
1Performance characteristics 1Technical features:
aFilling section:
The filling machine is designed and manufactured using the principle of atmospheric pressure filling,Realize the filling of liquid into washed cans.
The filling valve adopts an isobaric mechanical valve, which is fast and sensitive for filling, and has high liquid level accuracy for filling.
Having a comprehensive CIP systemCleaning function.
The combination of a filling valve with a guide device and a bottle cylinder lifting device ensures accurate sealing between the bottle mouth and the filling valve, reducing the phenomenon of material leakage from the tank mouth.
According to the height of the tank, manual lifting can be achieved to meet the filling requirements.
The use of gear transmission has high efficiency, low noise, long service life, easy maintenance, and sufficient lubrication. The main motor speed of the machine is controlled by a frequency converter, and this machine adopts stepless variable frequency speed regulation.
The bottle guide system has a simple structure and can be quickly and conveniently changed according to the tank type. The whole machine adopts a bottom support structure for transportation.
Whole machine PLCautomatic control,Fault online display, such as bottle blockage, missing lid, etc.
It has safety protection functions such as no valve opening without a can, no cover, and shutdown due to missing cover.
The material in the filling cylinder is automatically controlled, and the liquid level height is detected by a liquid level sensor to ensure stable liquid level and reliable filling.
bCover section:
The sealing part seals the lid onto the can that has already been filled with the product and sends it to the subsequent process through the conveyor chain.
The sealing roller adopts high hardness alloy steel quenching (HRC>62))The sealing curve is precision machined using optical curve grinding to ensure the quality of sealing and the normal operation of the machine.
This machine has a lid control system with a can under lid and no lid without a can, ensuring normal operation of the machine and reducing the rate of lid damage.
Manually place the aluminum cover in the chute and use gravity and a pusher to lower it. A detection switch is installed in the chute to ensure that the machine can stop when the cover is missing.
According to different heights of tank types, the capping machine can be manually raised and lowered to meet the requirements.
IITechnical Parameter
Rated output: 8000BPH(335mlCan)
Can canHigh: 80~135mm
Can canDiameter:ф45~ф70 mm
Applicable tank types:Easy to pull cans(200、202、206、209Need to change)
Applicable cover type:Standard aluminum cover
Number of filling heads: 18
Filling temperature: 0~4℃
Filling valve flow rate: 140~150ml/s
Number of sealing heads: 4
Motor power: 3KW
CO2Consumption:120g/hl
Compressed air consumption: 0.05m3/min(0.6MPaWhen)
Dimensions: 3150 × 1920 × 2700mm
Total weight of the machine: 3500Kg
three、Sales Terms and Conditions
1.payment method:T/ T,30%Advance payment, balance to be paid in full before leaving the factory70%.L/C,30%down payments,70%Pay on demand.
2.Warranty period: Free replacement of vulnerable parts within one year.And we will send our technicians to the client to repair the machine. Repair costs after the first yearEvery day per person60The US dollar.
3.We are responsible for installing and debugging the machine, and providing overseas training courses. But the client needs to bear the visa fees, round-trip travel expenses, accommodation, and daily expenses for each personAn allowance of $70. If the client requires translation, payment must be made per person per day70The cost in US dollars
4Company Profile
The main products are:
2000-- 30000 BPH hot filling production line (juice, tea)
2000 -- 30000 BPH Mineral water and purified water production line
2000 -- 30000 BPHCarbonated beverage production line
1000 – 8000 BPHVinegar, wine, and oil production line
100 -- 2000 BPH1 gallon3Gallons and5Gallon barrel production line
2000 -- 10000 BPHSoy milk, peanut milk and other protein beverage production lines
2~20T/HSupporting water treatment equipment (mineral water, purified water production line)
PETBottle injection molding machine and blow molding machine
Related equipment: bottle sorting machine, bottle pouring sterilization machine, spray (cooling) sterilization machine, concentration equipment, ultra-high temperature instantaneous sterilizerCIP on-site cleaning system, labeling machine, fully automatic heat shrink film packaging machine, etc.
Online inquiry